Archive Tender
S. No. | Title | End Date | Details | Amendment/Corrigendum |
---|---|---|---|---|
101 | Tender Acceptance letter regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) | 05/04/2021 |
Download (149.9 KB) ![]() |
- |
102 | Tender Acceptance letter regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 | 05/04/2021 |
Download (148.93 KB) ![]() |
- |
103 | Tender Acceptance letter regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 | 05/04/2021 |
Download (127.92 KB) ![]() |
- |
104 | Work Commencement letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) | 25/03/2021 |
Download (113.65 KB) ![]() |
- |
105 | Short NIT regarding A/R & M/O work of the University during 2020-21(S.H.: White Washing, distempering, plastering, painting etc.) | 30/03/2021 |
Download (143.44 KB) ![]() |
- |
106 | Tender Acceptance letter regarding regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) | 19/03/2021 |
Download (115.88 KB) ![]() |
- |
107 | NIT regarding Full Service Maintenance Agreement (FSMA) for a period of one year of two Photocopier Machines (Canon iR-ADV 4525) | 15/03/2021 |
Download (587.71 KB) ![]() |
- |
108 | NIT regarding renovation of toilets with fittings, pipelines, doors, door frame etc. in Saraswat Sadhna Sadan etc. complete of the University during 2020-21 | 25/03/2021 |
Download (132.85 KB) ![]() |
- |
109 | NIT regarding repairing of kirloskar make 10HP water lifting motor pump set etc. installed in pump house of the university during 2020-21 | 22/03/2021 |
Download (109.76 KB) ![]() |
Corrigendum against the dates mentioned in the NIT Download (49.56 KB) ![]() |
110 | NIT regarding infrastructure development of the University during 2020-21(S.H.: Replacement of underground damaged pipelines etc. for firefighting system installed in Saraswat Sadhna Sadan) | 25/03/2021 |
Download (161.23 KB) ![]() |
- |
111 | Acceptance Letter regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) | 31/03/2021 |
Download (93.85 KB) ![]() |
- |
112 | Infrastructure development of University during 2020-21 (S.H S/I/T/C of Networking Switch, Data & Electric Points etc in Library Building & Shaikshnik Sadan | 19/03/2021 |
Download (865.42 KB) ![]() |
- |
113 | NIT regarding conversion of roof of 250KVA DG set and STP near gate 1 etc. of the University during 2020-21(S.H.: Plastering, Profile Sheet, External & Internal Painting etc.) | 12/03/2021 |
Download (158.4 KB) ![]() |
- |
114 | NIT regarding infrastructure development of the University during 2020-21(S.H.: S/I/T/C of Public Address System in Swarna Jayanti Sadan basement) | 17/02/2021 |
Download (147.08 KB) ![]() |
- |
115 | Award letter regarding regarding the outsourcing of Accounts and Income Tax work in the SLBSNSU,Delhi | 31/01/2021 |
Download (70.49 KB) ![]() |
- |
116 | Letter of Work Commencement regarding round “O” clock running, operation and comprehensive annual maintenance contract of 120KLD fab type sewage treatment plant of the University | 31/12/2020 |
Download (74.9 KB) ![]() |
- |
117 | NIT regarding Laundry/Ironing/Dry Cleaning services for linen, Blankets, Curtains, Rajai Covers, Pillow Covers, Towels, Door Mats etc. at Guest House | 22/12/2020 |
Download (8.62 MB) ![]() |
- |
118 | NIQ regarding day by day maintenance of the University during 2020-21(S.H: changing of broken glass of MS window residential and non-residential buildings) | 10/11/2020 |
Download (472.4 KB) ![]() |
- |
119 | 2nd NIQ regarding outsourcing of Accounts and Income Tax work in the SLBSNSU,Delhi | 25/11/2020 |
Download (643.23 KB) ![]() |
Important notice for Bidders Download (36.36 KB) ![]() |
120 | Round "O" clock running operation and Comprehensive Annual Maintenance Contract of 120 KLD FAB Type Sewage Treatment Plant of the University | 30/11/2020 |
Download (72.93 KB) ![]() |
- |